Contact Council
Contact Council
menu
Inside Hay Shire Council
Companion Animals
Council Meetings and Reports
Council Plans and Reports
Council Newsletters
Councillors and Staff
Customer Service Centre
Economic Development
Employment Opportunities
Make Payments
News & Council Updates
Policies
Tenders
Your Say
Water, Waste & Roads
Roads and Cycleways
Road Closures
Sewer
Street Trees and Naturestrips
New 3 bin waste system
Waste and Recycling
Water
Building, Planning and Environment
Applications and Certificates
Asbestos
Building and Developments
Fire Control
Neighbour Issues
Planning
Plumbing and Drainage
Public Health Services
Swimming Pool Compliance
Weeds
Community Services
Aerodrome
Cemeteries
Community Trailers
Halls and Facilities
Library
Parks
Public Swimming Pool
Sporting Facilities
Family & Leisure
Education and Children
Health and Aged Care
Get Involved
About Our Region
About Hay
Economic Profile
Aboriginal Heritage
An overview of Hay Shire
Native Vegetation
Wildlife
Quicklinks
A-Z Service Finder
Business & Community Directory
Visit Hay
Facilities for Hire
Customer Service Centre
Flood Updates
Home
Flood Updates
Flood Updates from Hay Shire Council
Murrumbidgee River Master Plan 2021 Update - Sandy Point Reserve
At the February 2023 ordinary meeting, Council resolved to keep the access track along the beachfront of Sandy Point closed. Subsequently, at the October 2023 ordinary meeting, a notice of motion was put forward to seek permission to reinstate the access road along the beachfront of Sandy Point, remove the blockades and undertake a review of the Murrumbidgee River Masterplan. The blockades were removed; the sand has been relocated back to the beach area and the road has been reinstated. These works were completed prior to Christmas 2023.
A review of the Murrumbidgee River Masterplan has been undertaken to reflect Council requests. As part of the review, additional alterations were made to the plan to include works to replace the dilapidated retaining wall adjacent to the boat ramp to allow accessible fishing. This work will be funded from successful grant funds received from the recreational fishing trust grants ($98,300). Pages 14 and 15 (Sandy Point) of the Murrumbidgee River Masterplan 2021 have been amended (see attached) as follows:
Page 14 Changes:
• Removed first two concept proposes and included First Nations groups.
• The vision was amended to include replacement of dilapidated retaining wall.
• Scope of works amended to include application for funding to replace the dilapidated retaining wall adjacent to the boat ramp.
• Construction activities point number 7 and 8 were removed. Add boat ramp upgrade and improve road at beach.
• Remove picture of cable footbridge and replaced with fishing platform.
Page 15 Changes:
• In the legend section inclusions river access, amend point 1 to widened, amend point 2 to say Reinstate through road along beach, removed point 3, amend point 6 to say Accessible Fishing Platform, add point 7 to say Remove treated pine logs and rail fence around BBQ area and install No Camping signs and No Parking signs.
• Enlarged plan to include additional numbering 6 and 7. Removed purple garden graphics and reinstate road.
• On the large plan, include a fishing icon. Remove the icon and text box for second single boat ramp including access road to this ramp. Removed text box and graphics for pedestrian bridge link over the Murrumbidgee River.
Council at its December 2024 meeting resolved to place the updated Master Plan on public exhibition. Council will receive any comments up until Friday 14
th
March 2025.
Updated FINAL Master Plan REPORT 2024 - Sandy Point - December 2024
6.24 MB
Print
Categories:
Council News
Tags:
Rate this article:
No rating
Please
login
or
register
to post comments.
Theme picker
Flood Updates